Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Datasheets can be found here: Data sheet Tabs (Tracknet) hubs & sensors /wiki/spaces/SUM/pages/492584

 

After installation:

...

3. Install sensor
•Check the Sensor Plan and decisions from Step 1
•Indicate Sensor IDs on the floorplan > excel for mapping
•"deviating" sensors should be indicated as such on the Sensor Plan
4. Send Sensor Plan with sensor placement indication to Spacewell (scan, picture) for mapping

(Allow time for upload sensor ID and mapping (Spacewell))


5. Quality assessment in the field
Click here for the instructions on Quality Assurance for installation of motion and headcount sensors: Quality Assurance

 

 

View file
nameMotion Tab Placement Guide.pptx
height250

French version : Motion Tab Guide d Installation.pptx (v2020)

 

 

Workplace

Always check the detailed instruction in the Motion Tab Placement Guide.

If the situation you are facing deviates from these instructions/prerequisites, please contact Spacewell. Pictures / Drawings say more than a 1000 words.

 

1.Go to the workplace

...