Quality Assurance Occupancy and Utilization Sensor
Difficulty: novice
Content
- 1 Quality Assurance before installation (only for LoRa sensors)
- 2 Quality Assurance during installation
- 3 Quality Assurance during configuration/sensor deployment in Workplace Platform
- 4 Quality Assurance after configuration/on-site
- 5 QA after config, for Workplace installation (Browan -motion)
- 6 QA after config, for Meeting Room installation (Browan motion)
- 7 QA after config, for installation in Rooms under 4x4m (Browan motion)
- 8 QA after config, for Pointgrab & VergeSense
- 9 Quality Assurance after Dashboard setup
- 10 Final Validation at project end
Learning Objectives
After reading this article, you’ll be able to:
Identify at which steps Quality Assurance can be done
Perform Quality Assurance at each step
Quality Assurance (QA) is done throughout the installation project, since there are different steps in the project.
Following excel contains the different steps. Make sure to download, sign and save with the project information.
Quality Assurance before installation (only for LoRa sensors)
Motion sensors connect over the LoRa network. Make sure you install your LoRa hub before installing the sensors (check out LoRa Gateways, Hubs installation guides for more information).
1. Spacewell Implementation Consultant to check gateway status on sensor platform
2. If possible: Spacewell Implementation Consultant to add sensor upfront to Studio and check after gateway installation if data comes through in Studio
Quality Assurance during installation
If the situation you are facing deviates from these instructions/prerequisites, please contact Spacewell. Pictures / Drawings say more than a 1000 words.
Use the Placement Guides that are made available by Spacewell, see Install and Configure Gateways and Sensors .
Place the sensor sticker to the sensor plan or fill in the prepared excel (see Prepare batch import file before installation)
When installing sensors that have been installed elsewhere in the past (procedure to be defined with Spacewell Implementation Consultant): indicate the sensor ID on the sensor plan. Remember that every Browan sensor device ID is in hex (The values of a hexadecimal digit can be: 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, A, B, C, D, E, F)
Installer to take snapshots / examples of sensor placement during installation
Scan the sensor plan with the stickers of the sensor IDs
Send the snapshots and sensor plan to your Spacewell Implementation Consultant, who will use it to import the sensors in the Workplace Platform and will keep the files in the internal project folder
Visual inspection
Check that sensors are placed according to sensor placement guides; not hindered by cables, pipes, light fixtures or other obstructions
Blue light when waving hand in front of sensor
Quality Assurance during configuration/sensor deployment in Workplace Platform
Remember most (LoRa) device IDs are in hex (The values of a hexadecimal digit can be 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, A, B, C, D, E, F)
If device ID not readable in sensor plan: check sensor platform
Does the device ID exist?
Is it connecting to the correct hub?
If mapping done based on excel (see Prepare batch import file before installation)
Export sensor devices excel from Studio
Export MCS location IDs excel from MCS
Use VLOOKUP to map to sensor device ID to MCS location
Once VLOOKUP is executed check manually if done right
Check begin, mid and end of excel
Check for white spaces on live floorplan (red on Studio health view). These location could be missing mapping.
Quality Assurance after configuration/on-site
The Quality Check after configuration/on-site can happen after the mapping of the sensors in Workplace back-end Studio is done.
To be done by someone who didn’t install the sensors
Make sure you have access to the live floorplan via http://go.cobundu.com
Can be accessed via mobile phone as well
Make sure to bring the sensor plan
Ideally you have access to https://studio.cobundu.com , so that you can immediately make some changes
Below verifications should be written down, signed and added to the project documentation.
QA after config, for Workplace installation (Browan -motion)
QA after config, for Meeting Room installation (Browan motion)
QA after config, for installation in Rooms under 4x4m (Browan motion)
QA after config, for Pointgrab & VergeSense
Quality Assurance for headcount setup
For Vergesense sensors installed in open spaces, Quality Assurance should include 50% of the desks.
Quality Assurance for traffic / footfall count
Quality Assurance after Dashboard setup
See Dashboards
Final Validation at project end
Acceptance document stating deliverables (hardware, dashboards), date, name
Description of the project
Floorplans: changes, rendering, upload
Sensors and hubs: delivery, assistance in installation, upload, mapping
Setup live floorplan and kiosks, available through https://go.cobundu.com/
Creation of dashboard XYZ, available through https://go.cobundu.com
The volume and quality of the above-mentioned goods and/or services are in accordance with the agreements and scope agreed upon. Consequently, the elements stated above are fully accepted.