/
Zens Smart PuK Visual installation

Zens Smart PuK Visual installation

Difficulty: expert

Content

Learning Objectives

After reading this article, you’ll be able to:

  • prepare on-site locations for Zens installation


Installation is done by Zens.

Prerequisites

  • For the Smart PuK Visual / wireless charger:

    • A hole with a diameter of 81 mm needs to be drilled in the table at the position where the Smart PuK Visual should be placed.

    • 230V power plug

  • The motion sensor needs to be installed in the center at the bottom of the desk.

    • The ideal distance from the front of the desk to the front of the sensor is 300 to 350 mm

    • Provide an unobstructed view of the sensor for an optimal detection area

    • The motion sensor will be screwed with two screws on the underside of the desk

 

 


 

Search

Search